| Document |
Change |
Comments |
|
WSSS
|
Various sections of Part 1 General, Part 2 Water Supply, Part 3 Sewerage and Approvals
|
Insert amendment record at front following revision record
|
| Section |
Clause |
Page |
Change |
Comments |
|
Document history and revision record
|
|
|
Updated to include Amendment 1
|
Remove original document history and insert revised version
|
|
Registration
|
|
|
Address and phone details updated
|
Remove registration and insert revised copy
|
|
Registration form
|
|
|
ACTEW address details revised
|
Remove original forms and insert revised forms
|
|
Order form
|
|
|
ACTEW address details revised
|
|
Comments form
|
|
|
ACTEW address details revised
|
|
Part 1 - general
|
T.O.C
|
2
|
Updated to reflect page re-numbering
|
Remove original pages and insert revised pages
|
|
1.1
|
4-5
|
ACTEW objectives revised to bring in line with Utilities Act 2000
|
|
1.3, 1.4, 2
|
6-7
|
Pages re-numbered
|
|
3.1, 3.2
|
8-9
|
1st paragraph revised and pages re-numbered
|
|
4
|
10
|
Page re-numbered
|
|
5
|
11
|
List of legislation documents updated
|
|
6 and 7
|
12
|
Page re-numbered
|
|
9
|
13
|
Reference 9.6 updated and page re-numbered
|
|
Part 2 - water supply
|
T.O.C
|
3
|
Updated to include new clause (5.8)
|
Remove original pages and insert revised pages
|
| 2.6 |
6
|
References to Clause 6.7 and WSS 020 added
|
|
3.5.1
|
13
|
Sentence revised to reference Clause 3.5.4
|
|
3.5.4
|
14
|
Both dot point sentences revised
|
|
4.2
|
16
|
Modified PVC and Molecular Oriented PVC included in list of approved materials; PVC pipe sizes expanded to include 375/450; Paragraph relating to change in material added
|
|
4.4
|
17
|
Sentence relating to construction loads added
|
|
4.6
|
18
|
Final paragraph revised
|
|
4.7
|
18
|
Paragraph revised (trench and scour stop requirements revised)
|
|
5.8
|
20
|
New clause related to Pressure Reducing Valves added
|
|
6.1
|
22
|
Developer responsibility revised; reference to drawing WSS 028 added; reference to 10.1 updated
|
|
6.3
|
22
|
Meter issue and sizing details revised
|
|
6.5
|
23
|
The word "ball" removed from "Main tapping, copper riser..."
|
|
6.6
|
23
|
PVC-M and PVC-O added to service materials; Sentence relating to stop cocks added
|
|
6.7
|
24
|
First paragraph relating to tracer wire revised in association with revised drawing WSS 020
|
|
8.2
|
27
|
Standards AS4441 and AS4765 added
|
|
9
|
29
|
WSS 012 and WSS 020 drawing titles revised; drwaings WSS 012, 016, 020, 026, 027 revised; drawing WSS 028 added to drawing set
|
|
10
|
30
|
Reference 10.1 updated
|
|
Water supply drawings
|
WSS 012
|
|
Drainage at scour stops removed; scour and trench stop dimensions revised; degree of compaction detail revised (zone C); use of scour stop between grades 5 and 15% added
|
Remove original drawings and insert revised drawings
|
|
WSS 016
|
|
Min/max depth to spring hydrant corrected; cover reference to Std Drg WSS024 added
|
|
WSS 020
|
|
Drawing completely revised with >= DN50 service connections removed onto WSS028; Material Schedule added; Drawing Notes revised
|
|
WSS 026
|
|
DICL/PE connection detail revised; clearance to hydrant and Note 12 removed; cover reference to Std Drg WSS024 added
|
|
WSS 027
|
|
Fig 1 "100" dimension amended to "25"; reference added to Fig 4
|
|
WSS 028
|
|
New drawing detailing >= DN32 services created in part from WSS 020 (draft)
|
|
Part 3 - sewerage
|
2.5
|
12
|
Table 3-3. PVC DN150 and 225 requirements revised
|
Remove original pages and insert revised pages
|
|
3.1.3 (iii)
|
20
|
Paragraph revised (trench stops added and drainage point requirements removed)
|
|
4.4
|
25
|
First dot point: the word "inverts" added; Second dot point: scour stops removed and sentence expanded
|
|
5.1.11 (i)
|
33
|
The word "highest" added prior to "incoming pipe"
|
|
5.1.12
|
33
34
|
Changed "1:200" to "1:20";
Dot point relating to standard configurations removed
|
|
5.1.15
|
36
|
Paragraph added (relating to drawing WSS 053)
|
|
5.1.16
|
37
|
Paragraph added (relating to drawing WSS 053)
|
|
5.1.17
|
38
|
(i) Reference to drawing WSS 053 added
|
|
6.2.1
|
41
|
Reference to 10.1 updated
|
|
6.2.3
|
42
|
|
6.2.5
|
42
|
Reference to drawing WSS 054 added
|
|
7.1.4
|
46
|
Reference to 10.1 updated
|
|
9
|
55
|
WSS 056 and WSS 058 drawing titles revised; Drawings WSS 052, 053, 054, 056, 058, 061 and 062 revised
|
|
10
|
56
|
Reference 10.1 updated
|
| |
| Section |
Clause |
Page |
Change |
Comments |
|
Sewerage drawings
|
WSS 052
|
|
Trench drain removed; Note 8 revised and Note 10 removed; DICL socket at MH wall revised; Neck height in roads revised; iInterface at MH wall reference added
|
Remove original drawings and insert revised drawings
|
|
WSS 053
|
|
Type 4 bedding added to "Other Locations"; MH cover reference altered; neck height in roads revised; interface at MH wall reference added
|
|
WSS 054
|
|
Slope junction and tie bedding details revised; Property line to first socket dimension added; Note 1 requirements revised
|
|
WSS 056
|
|
Degree of compaction details revised; material specification detail revised
|
|
WSS 058
|
|
Class D concrete cover and frame removed; lifting recess detail removed
|
|
WSS 061
|
|
MS base support and trench fill details revised; ,etal cover and surround details revised/amended
|
|
WSS 062
|
|
Typographic error corrected (note 2, 1:20 replaces 1:200)
|
|
Approvals
|
T.O.C
|
3
|
Table of Contents updated to include new clause in Appendix H
|
Remove original pages and insert revised pages
|
|
1.1
|
4
|
First paragraph revised; second paragraph: "Corporation" removed after "ACTEW"
|
|
1.2
|
4
|
1st paragraph: "Corporations" removed after "ACTEW"
|
|
2.2.3
|
8
|
Requirement for form WSSS-1 added
|
|
2.2.6
|
9
|
Requirement for form WSSS-1 added
|
|
2.4.3
|
12
|
Reference to new clause added
|
|
2.4.4
|
12
|
First paragraph revised; Reference added to second paragraph
|
|
2.4.6
|
13
|
Second and third paragraphs: "ACTEW" replaces the word "inspector"
|
|
Appendix A
|
20
|
Hydraulic Services Deed definition revised
|
|
Appendix D
|
24
|
The word "trunk" removed (first dot point)
|
|
Appendix E
|
25
|
(ii) The words "and trench" and "thrust blocks, restrained joints" added after "positions of scour"
|
|
Appendix F
|
28
|
(i) Sentence relating to horizontally curved sewers revised;
(j) Property Connection requirements revised
|
|
Appendix H
|
33
|
6. Proving tool requirements revised (seventh dot point);
|
|
34
|
7. CCTV inspection requirements revised;
|
|
34
|
8. Both dot points revised to reflect associated changes in Pt 2, Clause 3.5.4
|
|
35
|
10. Dot point added to Product Certifications; Sentence relating to product certification and sample submittal added;
new Clause 11 added in relation to testing certificate requirements
|
|
Appendix I
|
36
|
Final dot point removed
|
|
Appendix J
|
37
|
Changed "the final inspection" to "all ACTEW inspections"
|
|
Appendix K
|
38
|
Changed "the final inspection" to "all ACTEW inspections";
2(e): Sentence revised (trench and scour stop requirements revised);
3(a): Sentence added
|
|
Appendix N
|
45
|
Paragraph added relating to list of trees; changed "Californian" to "Tasmanian" (final table);
the word "Not" added to first and second tables
|
|
Approvals forms
|
WSSS-0
|
|
ACTEW address details revised
|
Remove original forms and insert revised forms
|
|
WSSS-1
|
|
ACTEW address and Office Use details revised
|
|
WSSS-2
|
1
|
"No. of Dwellings" requirement and hydrant provision added; Connection Details removed;
|
|
2
|
ES Plan requirements revised; ACTEW address details revised
|
|
WSSS-3
|
|
ACTEW address details revised
|
|
WSSS-4
|
|
ACTEW address details revised
|
|
WSSS-5
|
|
Connection Details added (from WSSS-2)
|